Offline warehouse management for plants & SMEs. Start fast without an IT project.
OpsDeck360 brings warehouse workflows to Windows PC, tablet or notebook – offline on site. Start with CSV/Excel, become productive quickly, and connect ERP/SAP later if needed.
- Import parts/items (CSV/Excel)
- Book goods receipt / issue
- See stock, history and inventory status
📦 Show typical offline warehouse workflows
Processes
- Goods receipt
- Goods issue / withdrawals
- Transfers / location changes
- Inventory counting
- Stock checks / min stock
Where it fits
- Spare parts / MRO stores
- Production supply stores
- Technical warehouses
- Project / shutdown stores
- Mobile maintenance (tablet)
Perfect for fast implementation without a long IT project.
Offline on site instead of a cloud project
OpsDeck360 is designed as a local plant system: Windows PC/tablet/notebook, open the browser, start working. Especially useful when network access, approvals or central IT timelines slow things down.
What “offline warehouse management” means here
- Local data handling at the site (edge)
- Work possible even with unstable network
- No cloud requirement to get started
- ERP/SAP connection optional later
Typical SME advantage
Instead of spending months on integration planning, teams can start immediately: make stock visible, standardize bookings, reduce errors.
Offline warehouse use cases
Practical use cases for production, maintenance and technical stores.
Spare parts / MRO store
Technical parts, withdrawals, availability and traceability for maintenance teams.
- Issue bookings
- Min stock / availability
- Item history
Production warehouse
Manage consumables and components locally – clearly and quickly.
- Goods receipt
- Locations / transfers
- Inventory status
Project / shutdown store
Temporary warehouse structures for revisions, rebuilds or new lines – without heavy IT setup.
- Fast start
- Clear stock lists
- CSV export back
How it works: CSV/Excel → productive offline
A clear path to start without a big IT project.
1) Provide data
- Item master (CSV/Excel)
- Optional locations / opening stock
- Optional orders / tickets
2) Set up demo / pilot
- Import into your demo setup
- 15-minute review for your use case
- Start plant pilot (fixed price)
Three ways to start
From a quick demo to a complete offline-ready system at the site.
1) Demo with your data (48h)
Send CSV/Excel – we show your process in OpsDeck360 quickly.
- CSV import
- Sample process flow
- Short walkthrough
2) Pilot (30 days, fixed price)
One site, 1–2 live processes – measurable value with low risk.
- Kickoff + target setup
- Process configuration
- Coaching & review
3) Complete (system at site)
Preconfigured system for plant use – offline/edge and rollout-ready.
- Windows PC/tablet/notebook
- Offline-first
- Ready for rollout
Pilot for offline warehouse management
30 days · 1 site · fixed price – so you can make a confident decision fast.
Included in the pilot
- CSV/Excel import of your data
- Goods receipt / issue / stock view
- Optional inventory workflow
- Short training for team / shift
- Results review and recommendation
Outcome after 30 days
- Measurable fit, not just slides
- Clear decision for your site
- Roadmap: standalone or hybrid
Downloads
Material for plant managers, operations leaders and technical teams.
60-second fit check
Is OpsDeck360 a fit for your site? Three quick questions are enough for a first assessment.
Good fit if …
- You work with Excel/CSV or want to start that way
- You want to stabilize one site quickly
- ERP/SAP is not the starting point
Next step
Send a short email with site, use case and rough size – I will reply with a focused demo/pilot proposal.
FAQ – Offline warehouse management
Typical questions from plants, maintenance teams and SME operations.
Why offline instead of cloud?
Do we need SAP/ERP from day one?
Is it only for spare parts?
How fast can a pilot start?
Discuss offline warehouse management for your site
Send 2–3 details: site, use case, rough size. I will respond with a concrete next step.
Contact by email
Fastest path: email with company/site, area (MRO / production / project warehouse) and target outcome.